MEDIA INFORMATION

 
 
 
COLLECTION NAME:
NASA Kennedy Center Media Archive Collection
Record
Description:
KENNEDY SPACE CENTER, FLA. -- STS-116 Mission Specialist Robert Curbeam checks the fit of his helmet during suit fit-check, part of the prelaunch preparations during terminal countdown demonstration test (TCDT) activities. The mission crew is at KSC for the TCDT, which includes a simulated launch countdown. The STS-116 mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Kim Shiflett
Release Date:
11/14/2006
Photo Credit:
NASA or National Aeronautics and Space Administration
Release:
National Aeronautics and Space Administration John F. Kennedy Space Center Kennedy Space Center, Florida 32899
facet_who:
Robert Curbeam
facet_what:
International Space Station (ISS)
facet_where:
Florida
facet_when:
11-14-2006
facet_when_year:
2006
Photo Number:
KSC-06PD-2555
UID:
SPD-KSCMA-KSC-06PD-2555
original url:
Link To Source

KENNEDY SPACE CENTER, FLA. -- STS-116 Mission Specialist Robert Curbeam checks the fit of ...

KENNEDY SPACE CENTER, FLA. -- STS-116 Mission Specialist Robert Curbeam checks the fit of his helmet during suit fit-check, part of the prelaunch preparations during terminal countdown demonstration test (TCDT) activities. The mission crew is at KSC for the TCDT, which includes a simulated launch countdown. The STS-116 mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Kim Shiflett