MEDIA INFORMATION

 
 
 
COLLECTION NAME:
NASA Kennedy Center Media Archive Collection
Record
Description:
KENNEDY SPACE CENTER, FLA. -As if leaping out from amidst the woods, Space Shuttle Atlantis roars off Launch Pad 39B for a rendezvous with the International Space Station on mission STS-115. Liftoff was on-time at 11:14:55 a.m. EDT. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Ken Thornsley
Release Date:
09/09/2006
Photo Credit:
NASA or National Aeronautics and Space Administration
Release:
National Aeronautics and Space Administration John F. Kennedy Space Center Kennedy Space Center, Florida 32899
facet_what:
International Space Station (ISS)
facet_where:
Florida
facet_when:
09-09-2006
facet_when_year:
2006
Photo Number:
KSC-06PD-2118
UID:
SPD-KSCMA-KSC-06PD-2118
original url:
Link To Source

KENNEDY SPACE CENTER, FLA. -As if leaping out from amidst the woods, Space Shuttle Atlanti...

KENNEDY SPACE CENTER, FLA. -As if leaping out from amidst the woods, Space Shuttle Atlantis roars off Launch Pad 39B for a rendezvous with the International Space Station on mission STS-115. Liftoff was on-time at 11:14:55 a.m. EDT. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Ken Thornsley