REFINE 

Browse All : Images by John Grunsfeld of Florida from 2002

1-4 of 4
KENNEDY SPACE CENTER, Fla. - STS-109 Payload Commander John Grunsfeld arrives at KSC aboard a T-38 jet aircraft to begin launch preparations. This is Grunsfeld's fourth Shuttle flight. The goal of the 11-day mission is repair and maintenance on the Hubble Space Telescope. Five spacewalks are planned to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. Launch is scheduled for Feb. 28 at 6:48 a.m. EST
KENNEDY SPACE CENTER, F...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Payload Commander John Grunsfeld is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. Behind him is Mission Specialist Michael Massimino. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- As part of Terminal Countdown Demonstration Test activities, the STS-109 crew practices emergency exit from the Shuttle. Seated in the slidewire basket at the 195-foot level of the Fixed Service Structure are Mission Specialists Nancy Currie (left) and John Grunsfeld (reaching for the release lever). The TCDT also includes a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require five spacewalks to perform the tasks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- In the Vertical Processing Facility, STS-109 crew members take part in familiarization activities, looking over the payload of repair equipment they will be handling on the mission. From left are Mission Specialists Nancy Curry, Michael Massimino and Richard Linnehan, and Payload Commander John Grunsfeld. The goal of the mission is to service the Hubble Space Telescope, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera System, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation. Launch of Columbia on mission STS-109 is scheduled Feb. 28, 2002
KENNEDY SPACE CENTER, F...
NASA or National Aerona...
 
1-4 of 4